Why Tundra
Case Study
In 2017 Tundra contributed to the design as Principle Engineer on a 65 km pipeline system of up to 16″ line with two difficult river crossings for a total project cost of $85MM. These hydraulic calcs performed using traditional methods or even complex pipeline hydraulic software provided a solution for pressure drops and velocities etc. Yet complex (and expensive) process modelling tools that contemplate equations of state revealed a much different picture with respect to hydraulics than the simple tools. Critical mass allows Tundra Engineering Inc. to maintain these complex tools and the expertise to use them.
Enterprise Level EPCM
- “Checking the checking” level of rigour
- bury hours of many people into project invoices regardless of their true engagement
One man band
- “gut feel” engineering
- External design disciplines (electrical etc.)
- “Working in basement” level of professional environment
Tundra’s Market Position
- no project too small
- comfortable up to $100MM facility or $200MM pipeline
- Enterprise level EPCM systems, software’s and quality
As a MID-SIZE Engineering firm Tundra is able to:
- maintain a full service offering for the disciplines required for our projects
- maintain all of the software’s required to appropriately engineer our projects
- maintain all insurances and certifications